Tuesday, 04 March 2025

 

 

LATEST NEWS Droupadi Murmu Inaugurates Visitor’s Conference 2024-25 IAF Capability Enhancement Report Presented to Defence Minister Rajnath Singh National duty of every citizen to contribute to the welfare of soldiers & their families : Rajnath Singh at CSR Conclave Yudh Nashian Virudh: DC urges social, religious, sports organisations to come forward against drug abuse First All India Police Kabaddi Cluster Kicks Off in Jalandhar Randeep Hooda Shares Stunning Wildlife Photos, Advocates Conservation on World Wildlife Day Harjot Singh Bains & Finland Ambassador Launch Teacher Training Program Yudh Nashian Virudh : Big action on illegal property of Drug Smuggler in Bathinda Is Anora Available On OTT? Let’s Explore with 5 Dariya News From Nominees to Winners: The Inside Scoop on the Oscars Academy Awards India and Nepal Sign MoU to Strengthen Cooperation in Water, Sanitation, and Hygiene (WASH) INS Shardul, INS Sujata, and ICGS Veera Arrive in Thailand to Strengthen Maritime Cooperation India and Japan Declare 2025-26 as Year of Science & Technology Exchange Oscar Winning Actress Mikey Madison Net Worth 2025: Unveiling Her Income Sources & Career Highlights Sanjeev Arora Discusses Industrial Concerns with Bhagwant Mann India’s R&D Spending Doubles in a Decade, Driving Innovation in AI, Biotech & Quantum Computing Amit Shah Inaugurates Workshop on Sustainability & Circularity in Dairy Sector Punjab Police Busts Cybercrime Racket: Prime Accused Arrested for Running Fake Mining Department Website Himanshu Jain orders Health Department to promote anti-drug campaign to every village of Distt Rupnagar The LaLiga Showdown: Barcelona Vs Real Madrid Kuldeep Singh Pathania calls on Shiv Pratap Shukla

 

India takes another big step towards achieving 500 GW of non-fossil fuel based electricity installed capacity by 2030

Krishan Pal Gurjar, Raj Kumar Singh, R.K. Singh, BJP, Bharatiya Janata Party

Web Admin

Web Admin

5 Dariya News

New Delhi , 07 Dec 2022

R.K Singh, Union Minister for Power and NRE launched the plan “Transmission System for Integration of over 500 GW RE Capacity by 2030" here today.

Ministry of Power had constituted a high-level committee under Chairperson, Central Electricity Authority with representatives from Solar Energy Corporation of India, Central Transmission Utility of India Ltd, Power Grid Corporation of India Ltd, National Institute of Solar Energy, and National Institute of Wind Energy for planning the transmission system required for having 500 GW of non-fossil fuel based installed capacity by 2030.

The Committee prepared a detailed Plan titled “Transmission System for Integration of over 500 GW RE Capacity by 2030" in consultation with States and other stakeholders. The Plan is a major step towards achievement of the goal of integrating 500 GW of non-fossil fuel based capacity by 2030 by providing broad plan of required transmission system for having 537 GW of Renewable Energy capacity by the year 2030.

The planned additional transmission systems required for having 500 GW of non-fossil fuel include 8120 ckm of High Voltage Direct Current Transmission corridors (+800 kV and +350 kV), 25,960 ckm of 765 kV ac lines, 15,758 ckm of 400 kV lines and 1052 ckm of 220 kV cable at an estimated cost of 2.44 lakh crore.

The transmission plan also includes transmission system required for evacuation of 10 GW off-shore wind located in Gujarat and Tamilnadu at an estimated cost of Rs. 0.28 lakh crore. With the planned transmission system, the inter-regional capacity will increase to about 1.50 lakh MW by 2030 from 1.12 lakh MW at present.

Considering the availability of Renewable Energy based generation for a limited period during day, the Plan also envisages installation of Battery Energy Storage Capacity of the order of 51.5 GW by 2030 to provide Round the Clock power to end-consumers.

The Plan has identified major upcoming non-fossil fuel based generation centres in the country, which include Fatehgarh, Bhadla, Bikaner in Rajasthan, Khavda in Gujarat, Anantapur, Kurnool RE Zones in Andhra Pradesh, offshore wind potentials in Tamil Nadu and Gujarat, RE park in Ladakh etc. and based on these potential generation centres, transmission systems have been planned.

The planned transmission system projected will provide a visibility to the Renewable Energy Developers about the potential generation sites and scale of investment opportunity. Further, it will also provide the Transmission Service Providers the vision of growth opportunity available in the transmission sector along with investment opportunity of about 2.44 lakh crore.

With the above transmission plan for having 500 GW of non-fossil fuel capacity by 2030, along with transparent bidding system, an open market, an expeditious dispute resolution system, India will continue to be one of the most attractive destinations for investment in Renewable Energy.

India has emerged as one of the world leaders in energy transition with the fastest rate of growth of renewable energy capacities in the world. India has huge ambitions in energy transition and plans to have 500 GW of non-fossil fuel based electricity installed capacity by 2030, so that cleaner fuel comprises of 50% of the installed capacity mix by 2030.

The installed electricity generating capacity in the country at present is 409 GW comprising of 173 GW from non-fossil fuel sources, which is about 42% of the total installed electricity generating capacity. 

For evacuation of power from the planned Renewable capacity by 2030, a robust transmission system needs to be in place in advance as the gestation period of wind and solar based generation projects is much less than that of associated transmission system. A comprehensive plan has been finalized to meet this objective.

 

 

Tags: Krishan Pal Gurjar , Raj Kumar Singh , R.K. Singh , BJP , Bharatiya Janata Party

 

 

related news

 

 

 

5 Dariya News RNI Code: PUNMUL/2011/49000
© 2011-2025 | 5 Dariya News | All Rights Reserved
Powered by: CDS PVT LTD